Smart Port Logistics Hub Platform (KM5000 Data Center Construction) Project
1. Project Background
Industry Pain Points: The annual throughput of Ningbo Free Trade Zone Port exceeds 5 million TEUs, but there are problems such as low efficiency of container dispatching, customs clearance data islands, and cross-border logistics tracking delays
Policy Drivers: The RCEP agreement requires 72-hour customs clearance digitization, and data interconnection with the ports of the five ASEAN countries is required
2. Core Requirements
Real-time processing of 100,000 IoT device data (gantry crane sensors, AGV positioning, etc.)
Deployment of customs AI risk analysis system (processing 1 million customs declarations per year)
Building a digital twin port system (1:2000 3D modeling, 5000+ data points updated per second)
3. Technical Architecture Highlights
Hardware Layer:
Liquid-cooled server cluster (NVIDIA A100 80GB×32 nodes)
All-flash distributed storage (50PB available capacity, supporting 300,000 IOPS)
Intelligent micro-module computer room (PUE≤1.25, earthquake resistance 8)
Network Layer:
Active-active core switch (100G Spine-Leaf architecture)
5G MEC edge computing nodes (full coverage of port operation areas)
Blockchain cross-border dedicated line (directly connected to Singapore and Vietnam data centers)
Software layer:
Spatiotemporal database (PostgreSQL+TimescaleDB extension)
Digital twin engine (Unity Industrial real-time rendering)
Federated learning platform (cross-border logistics data security sharing)
4. Innovative applications
Intelligent berth allocation system:
Through reinforcement learning algorithms, ship waiting time is reduced by 40%
Customs risk warning sandbox:
Build 20+ risk models, increase the seizure rate to 92%, and the false alarm rate is less than 3%
Cross-border cold chain traceability:
Based on ultra-high frequency RFID+temperature chain, full visualization of fresh products such as durian is achieved
The products involved is: KM5000 data center
Smart Port Logistics Hub Platform (KM5000 Data Center Construction) Project
1. Project Background
Industry Pain Points: The annual throughput of Ningbo Free Trade Zone Port exceeds 5 million TEUs, but there are problems such as low efficiency of container dispatching, customs clearance data islands, and cross-border logistics tracking delays
Policy Drivers: The RCEP agreement requires 72-hour customs clearance digitization, and data interconnection with the ports of the five ASEAN countries is required
2. Core Requirements
Real-time processing of 100,000 IoT device data (gantry crane sensors, AGV positioning, etc.)
Deployment of customs AI risk analysis system (processing 1 million customs declarations per year)
Building a digital twin port system (1:2000 3D modeling, 5000+ data points updated per second)
3. Technical Architecture Highlights
Hardware Layer:
Liquid-cooled server cluster (NVIDIA A100 80GB×32 nodes)
All-flash distributed storage (50PB available capacity, supporting 300,000 IOPS)
Intelligent micro-module computer room (PUE≤1.25, earthquake resistance 8)
Network Layer:
Active-active core switch (100G Spine-Leaf architecture)
5G MEC edge computing nodes (full coverage of port operation areas)
Blockchain cross-border dedicated line (directly connected to Singapore and Vietnam data centers)
Software layer:
Spatiotemporal database (PostgreSQL+TimescaleDB extension)
Digital twin engine (Unity Industrial real-time rendering)
Federated learning platform (cross-border logistics data security sharing)
4. Innovative applications
Intelligent berth allocation system:
Through reinforcement learning algorithms, ship waiting time is reduced by 40%
Customs risk warning sandbox:
Build 20+ risk models, increase the seizure rate to 92%, and the false alarm rate is less than 3%
Cross-border cold chain traceability:
Based on ultra-high frequency RFID+temperature chain, full visualization of fresh products such as durian is achieved
The products involved is: KM5000 data center